IDOT 61C70: FAU 1634 (Steger Rd) Roadway Reconstruction and Bridge Replacement

Illinois Department of Transportation

  • The scope consisted of Roadway Reconstruction and Bridge Replacement on Steger Rd.
  • The project included pavement widening and resurfacing, sidewalk replacement, combination curb and gutter, storm sewer, water main and the construction of multi-cell box culvert with cast in place headwalls, between Scheer Road and US 45 in the Village of Frankfort.
  • The project consisted of HMA Pavement, HMA Bike Trail and PCC Box Culvert placements.
  • ICE provided materials engineering management, field geotechnical assessment, onsite embankment testing, subgrade evaluation and treatment recommendations, materials review to ensure compliance with contract documents, field mixture control quality assurance inspection and laboratory testing for HMA and PCC field specimens, as well as electronic reporting to the IDOT MISTIC system.