Illinois Construction & Environmental Consulting, Inc. served as a Sub-Consultant on this $12.4 million project.
The project consisted of staged construction for the removal and replacement of the asphalt pavement on US 20 which included lowering the final elevation of the pavement through a majority of the project and building new superelevations around curves.
The project also included various depth pavement removal/milling, Class B patching, the placement of mainline and shoulder asphalt pavement, longitudinal joint sealant, aggregate shoulders, shoulder regrading, removal of guardrail along with either re-erecting or replacement, traffic control, rumble strip installation, RPM installation, and pavement marking and grooving. This project also included all three of IDOT’s asphalt quality control programs, PFP, QCP, and QC/QA.
Key Project Components:
location
Rockford, IL
Prime Consultant
HR Green, Inc.
Owner
Illinois Department of Transportation
Construction Cost
$12.4 Million
Duration
2021 – 2022
Illinois Construction & Environmental Consulting, Inc. (I.C.E.) was founded on April 18th, 2014 after one of the coldest winters in Illinois History. We are an MBE/DBE Professional Services firm with IDOT Pre-Qualifications in Special Services.