Illinois Construction & Environmental Consulting, Inc. served as a subconsultant providing Phase III engineering services at selected locations on the 286-mile Tollway system on an on-call as needed basis.
Our service scope included the following: bridge deck patching, approach slab patching, expansion joint repairs, bridge deck overlay, bridge parapet repair, fiber wrap beam repair, abutment and beam repairs, accelerated deck slab repair, fast deck slab repair, fast approach slab repair and furnishing fast setting concrete, guardrail repair, lighting upgrades, removal and relocation of light poles, drainage system cleaning, ramp pavement and shoulder repair for entrance and exit ramps, maintenance of traffic, rumble strip removal and replacement, temporary barrier walls, stage changes, temporary & permanent pavement markings and project closeout.
Task order | Contract # | Project Descripton |
---|---|---|
TO# 1 | RR-16-5714 | Deck Patching, Mile long Bridge (BN 191 & 192) Tri-State Tollway (I-294) M.P. 20.6 to M.P. 22.4 |
TO# 2 | RR-16-5715 | Bridge and Ramp Repairs on the Jane Addams Memorial Tollway (I-90) M.P. 2.7 to M.P. 13.5 |
TO# 6 | RR-16-4253 RR-16-4254 | (4253) Roadway and Bridge Rehabilitation, Reagan Memorial Tollway (I-88), IL 251 to Annie Glidden Road M.P. 76.1 to M.P. 91.4 (4254) Roadway and Bridge Rehabilitation, Reagan Memorial Tollway (I-88), Annie Glidden Road to IL 56 M.P. 91.4 to M.P. 113.3 |
TO# 7 | RR-16-4274 | CM Closeout Services for Reagan Memorial Tollway, IL Route 47 Interchange M.P. 109.3 |
location
Systemwide
Prime Consultant
H.W. Lochner
Owner
Illinois State Toll Highway Authority
Construction Cost
$3,000,000 - $14,000,000
Duration
2017-2020